We run several computers and freezers at home, so reducing power costs mattered a lot for us. Their technician recommended a setup based on our actual usage instead of trying to oversell bigger systems. It’s refreshing dealing with people who don’t treat every customer like easy money.
April 2026
Bryan and his skillful crew of installers made getting a Tesla Power Wall a smooth and educational experience. Lots of hoops to jump through with regulators, permits and our electric utility, but they handled everything admirably. Thank you, Cascade Solar!
April 2026
I initiated discussions with Bryan and the team at Cascade in the fall of 2025 on the recommendation of a friend. Cascade provided me with an initial plan but I got busy and put the project down until February of 2026.
I spent February communicating with Bryan and his team as to the most appropriate final configuration of my system (which would come to include solar panels and a Tesla PowerWall 3 backup battery). Once the configuration was finalized, Bryan coordinated the filings with the utility company and with the city needed to get the project started.
I signed a definitive contract on March 11 and less than a month later (April... read full review
We run several computers and freezers at home, so reducing power costs mattered a lot for us. Their technician recommended a setup based on our actual usage instead of trying to oversell bigger systems. It’s refreshing dealing with people who don’t treat every customer like easy money.
Bryan and his skillful crew of installers made getting a Tesla Power Wall a smooth and educational experience. Lots of hoops to jump through with regulators, permits and our electric utility, but they handled everything admirably. Thank you, Cascade Solar!
I initiated discussions with Bryan and the team at Cascade in the fall of 2025 on the recommendation of a friend. Cascade provided me with an initial plan but I got busy and put the project down until February of 2026.
I spent February communicating with Bryan and his team as to the most appropriate final configuration of my system (which would come to include solar panels and a Tesla PowerWall 3 backup battery). Once the configuration was finalized, Bryan coordinated the filings with the utility company and with the city needed to get the project started.
I signed a definitive contract on March 11 and less than a month later (April... read full review