I needed two 30A circuits installed. I did the upfront grunt work of running the FMC and wires and had 5L-30R receptacles in place and Mr. Houde came and inspected what i had for code and then very quickly built a cutout in the sheetrock to access the flush mount panel, then hooked up the FMC into the panel, and hooked it up. all in 2hrs. He was gracious enough to wear booties when walking across the carpet.
I needed two 30A circuits installed. I did the upfront grunt work of running the FMC and wires and had 5L-30R receptacles in place and Mr. Houde came and inspected what i had for code and then very quickly built a cutout in the sheetrock to access the flush mount panel, then hooked up the FMC into the panel, and hooked it up. all in 2hrs. He was gracious enough to wear booties when walking across the carpet.