Contractors in Ellicott City

Contractors in Ellicott City picked by BestProsInTown

“I had my roof replaced in december of 2021. Nick and his crew came out and replaced my roof on my townhouse. Super professional, informative, on time. Good price. I've had zero issues with my roof. It took them less than a days work to complete. I highly recommend this company.“

5 Superb57 Reviews

“We had a great experience with a basement bath and gym/bedroom installation. It looks fantastic and the team was easy to work with. Good communication. Would definitely work with Ruslan again. Multiple neighbors have hired him as well for different projects.“

4.9 Superb36 Reviews

“Peak's team remodeled our bathroom recently and we're so happy we chose them! They were very professional, helpful with decisions and suggestions, and performed 5 STAR work! If we need further work in our home, they will be the folks we call. Do not hesitate to call them for an estimate--you'll be glad you did!“

5 Superb5 Reviews

“Bottom line: Their designer, Gamze, 5 stars. The best! Their main end product, a complete remodel of our 1985 kitchen and walled-off dining room into one new kitchen, 5 stars. Wife loves it! (Even I, the culinary-challenged half, like showing it off!)We started by contacting 3 contractors, of which Zenith just happened to be last. Gamze’s final estimate fell in between that of the other two, but Gamze simply just outperformed them. One of the two sent a very friendly and competent person to our home and spent quite a bit of time with us, but no drawings of their plan – only paper drawings of someone else’s “similar” task. The other one had to be re-contacted, then finally sent to us a rep who hand-waved their plan, predicting 3 weeks to finish, but no drawings.After Gamze’s first visit to our house and at Zenith’s Ellicott City store (three times there), we sat with Gamze who patiently interacted with us, modifying to our wants her on-screen drawings on-the-spot, sending us soft-copies, then afterward via texts, emails, and phone calls to tweak to what we wanted changed, again. She also helped us, while visiting their store and in-between visits and afterward, in selecting materials to be installed. Gamze also came out to our house a second time at about the 80% project-completion point, checking and taking measurements (to include applying a bubble-level) to ensure that her plan was being carried out.Three of their workers, Jose, Josue, and Caron (sp?) were especially helpful and skillful in their tasks, and their project manager, Oz, ensured that all installations and work happened.For statisticians reading this, the remodeling work began on 10/2/2023, and Zenith removed their lockbox on 12/1/2023 (8-1/2 weeks). This period included the kitchen gut-remodel plus replacing all of the first floor flooring (except for a small office) with LVP, and the first floor powder-room floor with small-stone tile. A lot of work!Truth-be-told, we actually began using our new kitchen on 11/4/2023, when it was about 99% finished, almost one month earlier than lockbox return day. Enclosed is a picture of it in the early morning dark that day, already in-use, plus another with the ceiling lights on. I’ll put in more pictures from different viewpoints if I can also get them in close-to showroom condition – which is not easy to do as my wife has the kitchen in nearly constant use!Am back, adding to the above: Could not get pictures of the new kitchen not in-use! So, 3 more pictures are added, showing it on Christmas Eve, 2 with a folding table added, all ready for 12 expected guests.“

4.6 Superb88 Reviews

map Map